1x25KV & 2x25KV TSS, SP, SSP's experience.
Faster Timelines in executing projects.
Executed projects in busy railway lines.
Have successfully upgraded and commissioned existing TSS, SP, SSP's in tough conditions such as no availability of approach roads and harsh weather conditions.
Balharshah – Kazipet Section: Design, Supply, Erection, Testing & Commissioning of additions and modifications at Traction Sub-Stations (TSS) for the proposed 3rd line, enhancing power capacity and operational reliability.
Vijayawada Division – Bapatla TSS: Repair and rewinding of 132/27 kV, 21.6 MVA Traction Transformer, restoring performance and extending asset life.
Gudur, Bapatla & Rajahmundry TSS: Upgradation of 25 kV, 50 Hz Single Phase AC Traction Sub-Stations by replacing existing 5/13.5 MVA transformers with 21.6/30.24 MVA Power Transformers, along with new switchgear and control systems.
Nallapadu – Satuluru and Dhone – Pendekallu Sections: Modification of existing 132/25 kV traction substations and switching stations to support doubling and electrification of the line.
Ammuguda SP & Budvel SSP: Construction of new 25 kV AC Single Phase switching stations including FP/Feeder Line modifications and additional TRD works at Sanathnagar TSS.
Balharshah – Kazipet – Vijayawada – Gunadala Section: Design & commissioning of 5 new 2×25 kV switching stations, supporting the expanding 3rd line infrastructure.
Renigunta & Rajampeta TSS: Periodical Overhauling (POH) of traction power transformers, improving operational efficiency.
GNP, BPA & ALER TSS: Comprehensive POH of three power transformers, followed by safe transportation and re-installation.
Anakapalle TSS: Installation & commissioning of 6600 KVAR at 40 kV power factor correction systems, including 13% series reactors for stable and efficient traction supply.
Design, Supply, Erection, Testing and Commissioning of new 2x25kV Switching Stations (5 No.) suitable for 3rd line section (excluding the provision of Auto Transformers) in Balharshah-Kazipet-Vijayawada-Gunadala section.
Mettur Dam TSS, Salem Division: Augmentation of power supply through replacement of 12.5 MVA Traction Transformer with a 21.6/30.21 MVA transformer and associated equipment.
Walajah Road – Ranipet Section: Engineering and commissioning of OHE-compatible 2×25 kV feeding system including SSP modifications.
Upgradation of PSI assets between Bilaspur – Durg, enhancing traction reliability and load handling.
Installation of additional 110 kV/25 kV traction transformers at UBL TSS to increase supply capability.
Augmentation of 132 kV/25 kV Traction Transformer at Ponduru TSS, Waltair Division.
Design, Supply, Erection, Testing & Commissioning of a 132/27 kV Single Phase Railway Traction Sub-Station at Divitipalli under the RE Doubling Project (Umdanagar – Mahabubnagar).